Office Modular Partition Wall Systems With Door
Technical Details
Series | BG65 | BG85 | BG100 |
Panel suspension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65mm | 85mm | 100mm |
Max height | 4000mm | 6000mm | 18000mm |
Panel width | 500-1200 mm | 500-1200 mm | 500-1200 mm |
Face material | 9mm | 9mm | 12 mm |
Passdoors | Single door or Double door | ||
Sound insulation | 28-38dB Rw | 28-42dB Rw | 32-50dB Rw |
Finish Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized) |
Finished Project
Advantages of moving walls
1: No floor track
Need not laid ground course, do not destroy whole to decorate the effect
2: Stable and firm
Each partition can be fixed independently, stable and reliable, not easy to swing
3: Sound insulation and environmental protection
Sound insulation effect is good, sound insulation coefficient can reach 50 db above
4: Heat insulation and energy saving
Excellent heat insulation performance, different seating rate pattern, the large space divided into small space
5: Efficient fire prevention
Adopt efficient fireproof material, good fireproof performance
6: Convenient collection
Close board when, partition wall can be concealed in special store ark, do not affect integral and beautiful
Packing and shipping
Case show
1:Factory direct price
2:Nice quality
3:Quick shipping with 5 days
4:Small order welcome
5:More than 3 years warranty6:Support customer designs OEM ODM service
FAQ
1:What you should you do on site?
A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install?
We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.
3:What is lead time ?
The lead time is 7 days to 10days.
4:How to transport?
Sea transport is a common mode of transportation.In an emergency,can be air freight .
5:How do the goods packing?
Carton paper package ,MDF batten cover all around cotner.
6:What is procurement procedure?
Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)
Secondly, we offer you the movable wall layout drawings for your confirmation.
Thirdly, we quote the movable wall in acordance with confirmed